DQM I & DQM II

Our terminals are strategically located next to the port of callao and have access to the railway line.

It combines state-of-the-art facilities, know-how and the highest international safety and environmental standards.

+19 years

of sustained
growth

70.830 m3

total
Capacity

OUR TANKS

Real time information ensures our clients access

57 tanks
  • All API 620 equipped to avoid emissions, minimize product loss and maintain product integrity.
  • All have individual pumps and radars.
  • High purity nitrogen supplied for blanketing.
  • Advanced vapor return systems.
  • Piping to truck-loading stations fully dedicated.
  • We have permits to handle the products controlled by entities such as SUNAT, PRODUCE, OSINERGMIN.
53 carbon steel tanks
  • Tanks ranging in size from 400 to 3.400 m3.
  • 51.380 m3 total capacity in DQM I.
  • 17.850 m3 total capacity in DQM II.
4 stainless steel tanks 316L
  • Nominal Capacities of 400 m3.
  • 1.600 m3 total capacity in DQM I.

OUR FACILITIES

10 truck-loading positions

Each one equipped with an electronic scale and automated scale system allowing truck loading process control, immediate product follow-up and inventory updating.

Operations Control Room

A control room in each terminal.

PLC and SCADA control systems.

Automated systems in loading and unloading processes.

REAL-TIME INFORMATION ENSURES OUR CLIENTS ACCESS TO ACCURATE PRODUCT INVENTORY AND OPERATIONS STATUS
Rail wagon station to receive and unload wagons

Capacity to receive up to 27 wagons of Sulfuric Acid.

Air pressured wagon unloading system.

WEB

Our clients access our virtual system that allows them to generate their daily operations and actions in real time.

Through DQMNET our clients control their orders for the pickup of their products.

Drum filling station

With individual electronic scale.

Lands available

For future expansions.

FACILITIES IN PORT OF CALLAO

5 stainless steel jetty lines.

4 jetty lines of 6” each allow simultaneous discharge of chemicals in DQM I y DQM II.

Also in DQM I, 1 jetty line of 10” for Sulfuric Acid.

3 Berths

Our Terminals are interconnected to three safe berths (B, C & E) on pier 5 by 1.030 m of fully piggable, stainless steel pipelines in APM Terminals.

11 meters draft

To attend deep-sea tankers and barges up to 200 LOA.

OUR TEAM

We form a multidisciplinary team sharing knowledge, expertise and best practices. We thrive on teamwork and we foster commitment, continuous improvement and the development of innovative initiatives. Integrity, respect and transparency are very important values for us.

SUSTAINABILITY

SAFE OPERATION

Our sustained efforts to improve safety allowed us to internalize a solid safety culture, a way of thinking and behaving in a safe manner at all times. With the highest standards, policies and programs, we take care of our staff members, the environment and our facilities. We also try hard to spread this culture among contractors and suppliers.

Our main focus is incident prevention; however, we are prepared to respond effectively in case something does not go as planned. We develop emergency drills and exercises to train our staff in different types of scenarios along with the National Coast Guard, firefighters and neighbor companies.

We are certified under the international standard of Occupational Health and Safety Assessment Series OHSAS - 18001: 2007.

ENVIRONMENTAL COMMITMENT

We work with environmental consciousness. We manage our operations through responsible health and safety management systems certified under international norms Integrated Management System (SIG) and ISO 14001:2015. We have developed programs to continuously optimize water and electricity consumption, and to minimize waste generation, segregating and recycling when possible..

CONTACT US

LEAVE US YOUR MESSAGE

Copyright © 2018 - Diseñador por: WPKS - Desarrollado por: DBlandIT